Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    GA-ASI Demonstrates Disaster Relief Comms System With SoftBank Corp.

    October 2, 2026

    SriLankan Airlines Boosts Regional Aviation Training Credentials with A330 Programme for Etihad Airways

    October 2, 2026

    Engineering the Extraordinary: XCMG Supports Landmark Twisting Tower Project in Egypt’s New Administrative Capital

    October 2, 2026
    Facebook X (Twitter) Instagram
    • Home
    • Contact Us
    Rabat DailyRabat Daily
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Rabat DailyRabat Daily
    Home » Engineering the Extraordinary: XCMG Supports Landmark Twisting Tower Project in Egypt’s New Administrative Capital
    PR Newswire

    Engineering the Extraordinary: XCMG Supports Landmark Twisting Tower Project in Egypt’s New Administrative Capital

    October 2, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email WhatsApp

    CAIRO, Oct. 2, 2026 /PRNewswire/ — XCMG is supporting the construction of Capital Diamond Tower within the Central Business District of Egypt’s New Administrative Capital. Planned to rise to a height of roughly 234 meters, the project is poised to become Africa’s tallest twisting mixed-use high-rise, and its distinctive silhouette is gradually taking shape as construction advances.

    XCMG Supports Landmark Twisting Tower Project in Egypt’s New Administrative Capital

    Each floor’s rotational offset at Capital Diamond Tower requires a recalculation of lifting plans, layouts, transport routes and anchorage points. Unlike conventional skyscrapers, the tower twists at a fixed angle on every floor, creating an ever-changing building profile and substantially greater construction complexity.

    To address these rigorous construction challenges, XCMG deployed a tailored integrated solution featuring “one crane, one hoist”. The tower crane undertakes heavy-lifting operations for core structural components, while the construction hoist manages vertical transportation of personnel and construction materials. Complementing each other seamlessly, the two units drive steady construction progress toward the landmark tower’s final completion.

    The XGT6515B-10S1 flat-top tower crane uses an internal climbing system to support construction of the main building structure and meet the requirements of the twisting architectural design.

    As construction progresses to higher floors, demand continues to increase for the high-frequency vertical transport of personnel, equipment, and small and medium-sized materials. The XCMG SC200/200MS1 construction hoist, with a maximum lifting speed of 63m/min and a height of 230 meters upon final installation, handles the on-site transport of personnel and materials.

    The building twists incrementally with every floor, placing stringent requirements on high-rise construction. XCMG’s equipment has been able to meet the site’s construction needs and provide reliable support, said the project manager.

    In addition, the XCMG service team delivered continuous on-site support throughout the construction phase to ensure seamless vertical transport operations.

    Lessons learned from integrating the tower crane and construction hoist will also inform XCMG’s equipment solutions for other complex high-rise projects.

    This year marks the 70th anniversary of diplomatic relations between China and Egypt. As the two countries continue to deepen the alignment of their development strategies, advance high-quality Belt and Road cooperation, unlock greater cooperation potential, and expand practical collaboration, XCMG will continue to support local infrastructure development through custom-engineered equipment solutions and on-site service capabilities.

    Cision View original content to download multimedia:https://www.prnewswire.co.uk/news-releases/engineering-the-extraordinary-xcmg-supports-landmark-twisting-tower-project-in-egypts-new-administrative-capital-302881386.html

    Related Posts

    Angel Aligner Upgrades Torque Ridges to “Pressure Points” in Europe

    October 2, 2026

    Diego Mesa Puyo takes over as CEO and Chairperson of the Global Environment Facility

    October 1, 2026

    Zhone Technologies Announces Acquisition of Tellabs Access, LLC

    October 1, 2026
    Latest News

    SriLankan Airlines Boosts Regional Aviation Training Credentials with A330 Programme for Etihad Airways

    October 2, 2026

    EU proposes secure EUCCS network linking first responders

    October 1, 2026

    India expands naval reach and maritime security role

    October 1, 2026

    China expands AI use across traditional Chinese medicine

    October 1, 2026

    DR Congo Ebola count reaches 8,067 cases across 7 provinces

    September 30, 2026

    Suleiman Khan alleges tyranny before PTI Islamabad march

    September 30, 2026

    India-US trade pact talks return at G20 meeting in Milwaukee

    September 30, 2026
    © 2026 Rabat Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.